NexGen Solutions
NexGen Gantt Base
NexGen Gantt Base β Shared OWL foundation for every NexGen Gantt app: interactive timelines, display polish, saved layouts, multi-format export/import, and a safe demo schedule β so each business adapter stays consistent without inventing Odoo workflow states.
What does this app do in Odoo 19?
NexGen Gantt Base is the technical foundation for the entire NexGen Gantt suite. It ships the reusable interactive Gantt client, polish controls, saved layouts, and exchange gateway used by Project, Manufacturing, Sales, Inventory, Purchase, Time Off, Field Service, and companion apps.
Technical name: syn_gantt_base. Depends on: Odoo Base, Web.
- Works with both Community and Enterprise editions (also Odoo.sh and on-premise)
- Server-authoritative schedule writes with native ACLs
- Does not invent Odoo workflow states (confirm / done / approve)
- Publisher: NexGen Solutions Β· Support: nexgensolutionsodoo@gmail.com
Key features overview
Explore the full capability map for NexGen Gantt Base on Odoo 19.
Feature map
Every major capability included in this module.
Features by section
Use the same tab navigation style as NexGen Access Management AI β Overview, Restrictions, Roles & Groups, AI & Tools, Audit & Workflow and FAQ.
Install once β explore the shared Gantt engine
Open the Foundation Demo, try scales and layouts, then add business adapters when ready.
Install once β start planning immediately
A short path from Apps install to a live interactive timeline.
Install
Install NexGen Gantt Base from Apps (requires Odoo Web).
Explore
Open Gantt β Foundation Demo to explore the interactive timeline.
Configure
Try scales, zoom, static mode, tooltips, and save a layout.
Extend
Install business adapters or All-in-One when ready.
One engine for every schedule
Ship Project, MRP, Sales and more on the same polished Gantt UX.
Layouts that stick
Save how each user prefers to view the plan.
Share the plan
Export timelines for meetings, partners and archives.
Built for the suite
Stay lightweight until you add adapters.
Safety boundaries built into the engine
Static mode, ACL-aware reads and create-only import helpers keep the foundation safe.
Static / read-only mode
Review timelines without accidental drag or resize.
No invented workflow states
Base never writes confirm/done/approve business states.
ACL-aware demo reads
Foundation Demo respects access rights.
Create-only import helpers
Validated imports never silently overwrite existing records.
Optimistic concurrency ready
Adapters inherit stale-write protection patterns.
Unscheduled tray rules
Undated records stay separated until intentionally placed.
Layouts, filters and shared viewing preferences
Per-user saved layouts and polish options help every planner keep their preferred board.
Saved layouts
Named personal layouts for scale, grid and polish options.
Per-user preferences
Each user can keep their own working view.
Shared engine consistency
All adapters inherit the same UX language.
Multi-company ready
Works within standard Odoo company rules.
Keyboard navigation
Arrows, Enter and T-for-today for power users.
Responsive chrome
Ready for Mobile companion breakpoints.
Tools: scales, zoom, export and suite hooks
HourβYear scales, zoom-to-fit, multi-format export and hooks for AI / Collaboration / Mobile.
Multi-scale timeline
Hour, day, week, month, quarter and year.
Zoom controls
Zoom in/out, reset and zoom-to-fit.
Export gateway
PDF, PNG, XLSX, JSON, XML, XER; optional iCal.
AI Planner ready
Install syn_gantt_ai for natural-language planning.
Collaboration ready
Install syn_gantt_collab for presence and locks.
Mobile ready
Install syn_gantt_mobile for phone/tablet chrome.
Workflow safety and audit-friendly foundation
Native Odoo remains the source of truth; companions add chatter and concurrency cues.
Native workflow untouched
Business confirm/done/approve stay in Odoo apps.
Adapter validators
Writes go through each adapterβs safe RPC path.
Chatter-ready design
Adapters can post schedule-change notes.
Suite documentation
Install order and regression docs in All-in-One.
Support path
Contact NexGen Solutions for help and customization.
OPL-1 distribution
Published for Odoo 19 App Store use.
FAQ
Build every schedule on one foundation
NexGen Gantt Base turns interactive scheduling into a reusable Odoo operating layer β shared scales, layouts, exports and safety patterns for every adapter.
Faster schedule decisions
See the whole plan on one interactive timeline so planners stop jumping between lists, calendars and spreadsheets.
- β’ Hour through year scales
- β’ Zoom, today marker and fit
Safer planning in Odoo
Update schedule fields with ACL-aware writes while native confirm, done, approve and validate actions stay authoritative.
- β’ No invented workflow states
- β’ Server-side validation
Clearer capacity insight
Spot overload early with load histograms, progress cues, critical path and baseline comparisons where supported.
- β’ Resource / work-center load
- β’ Progress and variance cues
Better team coordination
Keep planners aligned with saved layouts, filters, optional live presence and edit locks across the suite.
- β’ Saved personal layouts
- β’ Collaboration-ready
Share plans instantly
Export boards for meetings, partners and archives in the formats your team already uses.
- β’ PDF, PNG, XLSX, JSON
- β’ Exchange formats when enabled
Plan on any device
Use responsive Gantt chrome and optional Mobile/PWA companions for phone and tablet dispatch or review.
- β’ Touch-friendly controls
- β’ Mobile hub deep-links
AI-assisted rescheduling
Ask for delay/move plans in plain language, preview the impact, then apply only through adapter validators.
- β’ Preview-first AI plans
- β’ Local rule engine by default
Lower scheduling tool cost
Replace fragmented timeline tools with one NexGen Gantt UX shared across Project, MRP, Sales, Inventory and more.
- β’ One consistent engine
- β’ Suite or single-adapter install
Install the foundation
Add Base and explore the Foundation Demo timeline.
Configure the board
Choose scales, zoom, static mode and save a layout.
Extend with adapters
Install Project, MRP, Sale and more when ready.
One foundation vs fragmented Gantt tools
Stop stitching separate timeline widgets. Get one shared Odoo Gantt engine for every NexGen adapter.
NexGen Gantt Base
One foundation. Shared UX. Ready for every adapter.
- β Reusable interactive Gantt engine
- β Scales, zoom, layouts and polish
- β Multi-format export gateway
- β AI / Collab / Mobile ready hooks
Typical multi-app approach
Buy several timeline tools, then stitch them together yourself.
- β One-off custom Gantt per app
- β Inconsistent UX across departments
- β Export/import often missing
- β Hard to extend safely
Shared engine
One OWL foundation for all adapters.
Faster rollout
Install Base, then add domains as needed.
Export built-in
PDF, PNG, XLSX, JSON and more.
Safety-first
No invented workflow states.
Related modules
Explore the NexGen Gantt suite and other NexGen Solutions apps for Odoo 19.
Ready for interactive Gantt on Odoo 19?
Published by NexGen Solutions for Odoo 19. Support: nexgensolutionsodoo@gmail.com